Completed works:

Mounting of ventilation systems, including:
- Recirculation system for cooling engine hall of diesel generator plants;
- Inlet systems;
- Exhaust systems;
- Inlet and recirculation systems;
- Local suction from fuel equipment test benches;
- Emergency system of ventilation of the premises of the refrigeration machines;
- Installation of supply systems;
- Installation of the extraction anti-smoke installations.

Description

Novovoronezh NPP-2 is the first generation 3+ plant in Russia.

The design of NPP with VVER-1200 all security functions are provided by active and passive systems independent of each other, which guarantees reliable operation of the station and its resistance to internal and external influences.

Unit 1 with VVER-1200 generation "3+" reactor was commissioned for commercial operation on February 27, 2017. InSetKom workers carried out work in the reserve diesel power plant of the emergency power supply system buildings (11 UBN and 13 UBN).

Нововоронежская АЭС-2

Completed works

Ventilation systems installation, including:

  • Recirculating cooling systems for engine rooms of the diesel generator sets;
  • Supply systems;
  • Extract systems;
  • Inflow and recirculation systems;
  • Systems of local suction from fuel injection equipment test benches;
  • The emergency ventilation system of the rooms of the refrigeration machines;
  • Mounting of the air-supply systems;
  • Mounting of exhaust anti-smoke installations.